Bu Hussa Project
Project Requirements:
Stud Bolt with Heavy Hex Nut ASTM A193 Gr. B7/B7M / ASTM A194 Gr. 2H / 2HM
Project Start Date
2021
Project Location
Abu Dhabi, UAE
Supplier QTY
50 Tons
About the project
Abu Dhabi, UAE – May 10, 2021: The Abu Dhabi National Oil Company (ADNOC), announced today, an investment of up to $318 million (AED1.16 billion) to connect newly drilled smart wells to the main production facilities at Bu Hasa, which will sustain production capacity of 650,000 barrels per day (bpd) at ADNOC’s largest onshore asset.
The Bu Hasa asset is located 200 kilometers south of Abu Dhabi city. It is one of ADNOC’s oldest oil fields that have been producing since 1965.



