Archives: Lq-project

Water Desalination project R02 Alkhobar

Socar Haor Modernization- Azerbaijan – Russia Project Requirements: Stud Bolt with Heavy Hex Nut ASTM A193 Gr. B7 / ASTM A194 Gr. 2H / SS316 and Duplex UNS S32750 / S32760 Project Start Date 2023 Project Location Khobar, Saudi Arabia Supplier QTY 200 Tons About the project The plant, which…

Socar Haor Modernization- Azerbaijan – Russia

Socar Haor Modernization- Azerbaijan – Russia Project Requirements: Structural Bolt with hex nut and washer EN14399-3 CL 8.8HR / EN14399-3 CL 8HR / EN14399-5 – H Project Start Date 2019 Project Location Russia Supplier QTY 100 Tons About the project For the project of modernization and reconstruction (Package A) of…

Riyadh Metro – Saudi

Riyadh Metro – Saudi Project Requirements: Structural Bolt with Heavy Hex Nut & Flat washer ASTM F3125 Gr. A325M T-1 & A490M T-1 / ASTM A563M CL 10S / ASTM F436M T-1 Project Start Date 2019 Project Location Riyadh, Saudia Arabia Supplier QTY 250 Tons About the project Riyadh is…

Noor Project

Noor Project Project Requirements: Structural Bolt ASTM A325M T-1 / ASTM A563M CL 10S / ASTM F436M T-1 Project Start Date 2020 Project Location Dubai, UAE Supplier QTY 200 Tons About the project The 950 MW hybrid project (700MW CSP  & 250MW PV) fourth phase of the Mohammed Bin Rashid…

Bu Hussa Project

Bu Hussa Project Project Requirements: Stud Bolt with Heavy Hex Nut ASTM A193 Gr. B7/B7M / ASTM A194 Gr. 2H / 2HM Project Start Date 2021 Project Location Abu Dhabi, UAE Supplier QTY 50 Tons About the project Abu Dhabi, UAE – May 10, 2021: The Abu Dhabi National Oil Company…
Translate »