Leading

Industrial Solutions

Certified Company

ISO 9001

Leading

Industrial Solutions

Certified Company

ISO 9001

Project

Water Desalination Project R02, Al Khobar (Saudi Arabia)

Categories

Industrial

Status

Time

Completed

Client

Description

Petrofast Group played a pivotal role in supporting the largest reverse-osmosis (RO) desalination plant constructed by Acciona and RTCC in the Kingdom. This project, located in Al Khobar, forms part of a larger series of massive capacity RO plants—with Al Khobar 1 & 2 capable of producing 200 and 630 million liters per day, alongside others in Shuqaiq and Jubail.

Petrofast supplied essential components, including high-grade stud bolts and heavy hex nuts (ASTM A193 Gr. B7, A194 Gr. 2H, SS316, Duplex S32750/S32760), delivering approximately 200 tons of hardware that met stringent engineering and operational demands. These fasteners are critical for maintaining structural integrity in high-pressure RO systems, ensuring leak-free, durable performance.

Throughout the project, Petrofast demonstrated ethical professionalism—honoring commitments, fostering teamwork, and upholding values like accuracy and reliability. This reinforced its reputation as a trusted partner in delivering large-scale water infrastructure in the region.

arArabic