Although Petrofast isn’t directly named among the main consortium (FAST Alliance) delivering Lines 4, 5, and 6, their involvement likely centers on supplying vital structural or mechanical components—such as bolts, nuts, and fastening systems—given their role in similarly large infrastructure projects.
The FAST Consortium (FCC, Samsung C&T, Alstom, Strukton, Freyssinet, etc.) undertook a massive construction scope: over 64 km of track, 26 driverless trains, multiple depots, stations, and power/control systems. The project achieved remarkable milestones like 21 million safe man-hours and extensive material recycling and reuse.
Petrofast’s contribution, though less visible, would be crucial in ensuring structural, mechanical, and operational reliability across elevated viaducts, tunnels, and stations. Their reputation for ethical, precise, and dependable supply underlines how they support such mega-infrastructure by providing high-quality fasteners or parts that withstand demanding construction conditions and ensure long-term durability.